GOGOGO,GOGOGO在线观看免费观看完整版高清,GOGOGO免费高清完整版,GOGOGO免费高清完整,GOGOGO国语版免费播放,GOGOGO高清国语完整

Today:
首頁 > English > News Gallery > Company Everts > Company News

MBEC Wins the Bid of Sichuang-Tibet Highway Reconstruction Project

Source:    Date:2012-08-20  

Recently, MBEC won the bid of section II of national highway No. 318 Sichuang-Tibet highway (Tibet side) Tongmai to No.105 reconstruction project. The accepted contract amount is 344.5 million RMB and the construction period is 3 years.


The total length of this section is 2.8 km, including subgrade, pavement, super major bridge and culvert etc. Polonggou super major bridge e is a composite cable-stayed Bridge with a main span of 430m.. The middle span of the main girder is composite girder, the side span is prestressing concrete girder. The span arrangement is (45+50+60+430+60+50+46)m.. This bridge has been recognized as the “First Bridge” of Tibet. The total length of the culvert is 1390m and the construction method is drilling and blasting method.

up:

next:

欢迎光临: 石柱| 响水县| 定陶县| 巴马| 汕头市| 青阳县| 灵山县| 迁安市| 南安市| 金溪县| 苏州市| 秦皇岛市| 佛冈县| 谢通门县| 博罗县| 安泽县| 广德县| 宜兰市| 株洲县| 荥经县| 新宾| 邓州市| 孟连| 怀远县| 逊克县| 吉林省| 石台县| 铜梁县| 呼伦贝尔市| 建始县| 霞浦县| 依安县| 托克逊县| 博客| 苍山县| 青阳县| 陵川县| 易门县| 页游| 兖州市| 高阳县|