GOGOGO,GOGOGO在线观看免费观看完整版高清,GOGOGO免费高清完整版,GOGOGO免费高清完整,GOGOGO国语版免费播放,GOGOGO高清国语完整

Today:
首頁 > English > News Gallery > Company Everts > Company News

MBEC is Awarded with Package No.5 for Phase Ⅰ for Line 14 of Mass Rapid Transit in Guangzhou

Source:    Date:2014-03-11  

On March 5, MBEC is awarded with Package No.5 for Phase for Line 14 of Mass Rapid Transit in Guangzhou has a construction period of 852 calendar days. The total length for main line of the project is 6301m and 988m for branch lines which will be undertaken by MBEC 2.

Package No.5 for Phase for Line 14 of Mass Rapid Transit in Guangzhou is comprised of the following scope: Structural and Ancillary Works for Xinhe Transit Station and Taiping Station, Viaduct Section for Lijiatang to Xinhe,  Structural and Ancillary Works for Viaduct Section from Xinhe to Taiping, Precast Beams for Taiping Viaduct Section and Curbs. The total length for bridge part is 6.3km having typical span of 40m with maximum span of 150m; Roadway, bridge, drainage, traffic works, diversion works etc. for upgrading works for section K30+240K36+790 for Guangcong Road as well as other works. The bridge works will include 5 nos. pedestrian bridges, 3 nos. interchanges having typical span of 40m and maximum span of 60m.

up:

next:

欢迎光临: 黎城县| 富顺县| 淮阳县| 达日县| 宕昌县| 连江县| 黄冈市| 吉安市| 靖西县| 金秀| 南开区| 班戈县| 呼和浩特市| 塔河县| 青铜峡市| 弥勒县| 丘北县| 东乡县| 西乌珠穆沁旗| 丰原市| 兴国县| 新河县| 枝江市| 高雄市| 安吉县| 石景山区| 原阳县| 呼玛县| 西乡县| 韶关市| 淳安县| 肥东县| 讷河市| 玉林市| 石柱| 平原县| 山东| 奉贤区| 南康市| 广州市| 鹿邑县|