三年在线观看免费国语,三年成全免费观看大全在线观看,三年成都中文在线观看免费版,三年大片在线观看免费观看第一集,三年大片高清影视大全,三年DVD免费观看大全

Today:
首頁 > English > News Gallery > Company Everts > Company News

MBEC is Awarded with Package No.5 for Phase Ⅰ for Line 14 of Mass Rapid Transit in Guangzhou

Source:    Date:2014-03-11  

On March 5, MBEC is awarded with Package No.5 for Phase for Line 14 of Mass Rapid Transit in Guangzhou has a construction period of 852 calendar days. The total length for main line of the project is 6301m and 988m for branch lines which will be undertaken by MBEC 2.

Package No.5 for Phase for Line 14 of Mass Rapid Transit in Guangzhou is comprised of the following scope: Structural and Ancillary Works for Xinhe Transit Station and Taiping Station, Viaduct Section for Lijiatang to Xinhe,  Structural and Ancillary Works for Viaduct Section from Xinhe to Taiping, Precast Beams for Taiping Viaduct Section and Curbs. The total length for bridge part is 6.3km having typical span of 40m with maximum span of 150m; Roadway, bridge, drainage, traffic works, diversion works etc. for upgrading works for section K30+240K36+790 for Guangcong Road as well as other works. The bridge works will include 5 nos. pedestrian bridges, 3 nos. interchanges having typical span of 40m and maximum span of 60m.

up:

next:

欢迎光临: 马边| 融水| 周宁县| 永兴县| 泗水县| 大厂| 辽源市| 垣曲县| 和静县| 东阿县| 宕昌县| 黄骅市| 长海县| 海城市| 天水市| 庆安县| 河津市| 泸水县| 汉川市| 溧阳市| 子长县| 拜泉县| 胶州市| 烟台市| 开江县| 固安县| 固始县| 且末县| 顺平县| 温泉县| 林州市| 资兴市| 吉安县| 辉县市| 抚顺县| 巴塘县| 福安市| 宣城市| 奎屯市| 庆元县| 博客|