GOGOGO,GOGOGO在线观看免费观看完整版高清,GOGOGO免费高清完整版,GOGOGO免费高清完整,GOGOGO国语版免费播放,GOGOGO高清国语完整

Today:
首頁 > English > News Gallery > Company Everts > Company News

Hong kong-Zhuhai-Macao Bridge (Section CB05) --The First Pile Cap Πer Shaft Prefabricated Successfully

Source:    Date:2013-02-27  

On 22th of February 2013, the first pile cap pier shaft of Hong kong-Zhuhai-Macao Bridge (Section CB05) was precast successfully at Zhongshan base. The first prefabricated pile cap & pier shaft was cast integrated. The pile cap is 15.6m in length, 11.4m in wide and 4.5m in height; the bottom section of pier shaft is 14.29m. The total quantities of reinforcement and stainless reinforcement are 191t and 37.4t respectively, and that of concrete is 867m3. The total weight of the first pile cap & pier shaft is 2500t.

up:

next:

欢迎光临: 巫山县| 桃园县| 嘉荫县| 通榆县| 青浦区| 射阳县| 巴林右旗| 昭通市| 确山县| 石首市| 贺州市| 安阳市| 万宁市| 漳浦县| 吴江市| 睢宁县| 精河县| 永春县| 旬阳县| 于都县| 徐闻县| 潼南县| 循化| 巴林左旗| 天镇县| 万山特区| 安泽县| 丰镇市| 古蔺县| 西藏| 自贡市| 禹城市| 黎川县| 宿州市| 磐安县| 奉新县| 泸溪县| 元氏县| 谷城县| 隆化县| 靖州|