GOGOGO,GOGOGO在线观看免费观看完整版高清,GOGOGO免费高清完整版,GOGOGO免费高清完整,GOGOGO国语版免费播放,GOGOGO高清国语完整

Today:
首頁 > English > News Gallery > Company Everts > Company News

MBEC Wins the 2nd Stage of Northland Viaduct Project

Source:    Date:2013-11-12  

Recently, MBEC won the 2nd Stage of Northland Viaduct Project, the accepted Contract Amount is 173680585.00 yuan and the construction period from September 21st, 2013 to October 31st, 2014. The Shenyang Engineering Company will be responsible for the construction works.

The project locating in Central Business District of Benxi City includes the main bridge in a single-pylon cable-stayed bridge form and the approach adopting RC Cast-in-situ box girder and PC Cast-in-situ box girder. The detailed span arrangement is (32.5+40+30.76) m+ (152+48+42) m+13m, of which the (152+48+42) m constitutes the main bridge. The main beam is in a combined form of steel beam and PC Beam.

up:

next:

欢迎光临: 永靖县| 明光市| 阳朔县| 鞍山市| 和田市| 开化县| 彭州市| 林西县| 定边县| 吉隆县| 大竹县| 苍溪县| 横峰县| 江门市| 商水县| 莱阳市| 江门市| 井冈山市| 南岸区| 白水县| 英德市| 名山县| 合江县| 临洮县| 江陵县| 藁城市| 广安市| 郯城县| 乡城县| 横峰县| 河池市| 正定县| 庄浪县| 洮南市| 蕲春县| 肇庆市| 阳泉市| 南开区| 长泰县| 台山市| 云南省|