三年在线观看免费国语,三年成全免费观看大全在线观看,三年成都中文在线观看免费版,三年大片在线观看免费观看第一集,三年大片高清影视大全,三年DVD免费观看大全

Today:
首頁 > English > News Gallery > Company Everts > Company News

Ma’anshan Yangtze River Bridge Opened to Traffic

Source:    Date:2014-01-13  

Ma’anshan Yangtze River Bridge was officially opened to traffic.


The bridge is one of the national key projects, totally costs RMB 7,078,000,000. With a total length of 36.14km, among which covers the part crossing the Yangtze River of 11km, it was designed in an expressway standard with dual way six lanes. The main bridge crossing the Yangtze River is divided into two parts by the central shoal, the right part and the left part. The right part locating on the Ma’anshan side is the first three-pylon two spans cable-stayed bridge with arch-shape towers in China. While the left part near the Hexian County is a three-pylon two spans suspension bridge, with a length of 1080m, the main span ranks the first among bridges of the same category around the world, and it symbolizes the breakthrough of the span of such category main bridges from 100m to 1000m.


MBEC undertook the construction of the left three-pylon two spans suspension bridge.

up:

next:

欢迎光临: 西宁市| 柳江县| 临沭县| 崇义县| 凌海市| SHOW| 台州市| 北辰区| 刚察县| 沈丘县| 满城县| 凭祥市| 马鞍山市| 玉屏| 石台县| 乌恰县| 柘荣县| 哈密市| 新兴县| 阜新市| 鄄城县| 惠来县| 呼图壁县| 阳江市| 科技| 兰考县| 大理市| 汪清县| 甘肃省| 福安市| 荥经县| 苏尼特左旗| 班戈县| 察哈| 淮北市| 攀枝花市| 杭州市| 新绛县| 平潭县| 博白县| 策勒县|